Thanks Thanks:  0
Dislikes Dislikes:  0
Results 1 to 2 of 2

Thread: Techs vs MIF

  1. #1
    Senior Tech 250+ Posts
    Techs vs MIF

    MunsterTech's Avatar
    Join Date
    Sep 2014
    Location
    limerick
    Posts
    373
    Rep Power
    24

    Techs vs MIF

    Hi,

    Had a service meeting the other day, usual stuff, but one technician asked how many machines in the MIF should one tech be responsible for, ie 1 tech for 200/300/400 machines etc?

    Service manager came up with a figure, which he said was Industry standard?? of in the older days of analogue machines, 1 tech would usually look after approx 250 machines, any higher and another tech would be hired. He continued, that now days the machines are easier to fix?? (not sure i agree) and said that 1 tech should have around 400 machines before another tech is hired?? Which i thought was excessive, as we have alot more machines now and alot less techs than we did 10-12 yrs ago. So, in conclusion

    what is the industry standard on number of machines in MIF against number of techs??

    tks

  2. #2
    Master Of The Obvious 10,000+ Posts
    Techs vs MIF

    blackcat4866's Avatar
    Join Date
    Jul 2007
    Location
    Lapeer, Michigan
    Posts
    22,469
    Rep Power
    463

    Re: Techs vs MIF

    A more useful number might be total number of clicks per month. The reason that I say this is I have two machines that together do 1M clicks each month. I'm there 3 or 4 days each month, yet I'm willing to bet that they account for the largest part of my total clicks. If I had two more machines like this I would surpass most other techs in clicks, and have a total of 4 machines. And I could probably work 8 days a month.

    I guess my point is that there are far too many variables to speculate a specific number of machines. You would have to break it down by segments to get any sort of meaningful number. Another thing to keep in mind, is that low volume machines that get an annual "cleaning" might make 10K. On my high volume machines that 10K will happen before 8:00 AM the first day.

    =^..^=
    If you'd like a serious answer to your request:
    1) demonstrate that you've read the manual
    2) demonstrate that you made some attempt to fix it.
    3) if you're going to ask about jams include the jam code.
    4) if you're going to ask about an error code include the error code.
    5) You are the person onsite. Only you can make observations.

    blackcat: Master Of The Obvious =^..^=

Bookmarks

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •  
Get the Android App
click or scan for the Copytechnet Mobile App

-= -= -= -= -=


IDrive Remote Backup

Lunarpages Internet Solutions

Advertise on Copytechnet

Your Link Here