Action to Take after Replacement
After replacing the image processor PCB with a new one, take the following action:
- Download the latest firmware with the UST.
- Enter all values recorded on the service label affixed to the rear cover.
MEMO:
In the case of the Europe model:
If the firmware of the DC Controller PCB or the Main Controller PCB is not correct, the main power switch becomes OFF automatically.
Therefore, when update of the firmware is not possible, turn on the main power switch after disconnect the connector of the main power switch, and update the correct
firmware which matched the model.
After the update the firmware, install the removed connector by necessity.
Power Switch.jpg
Bookmarks