New Case Study From Gas Liquids Engineering Highlights Meeker II inColorado, Complete

Collapse
This topic is closed.
X
X
 
  • Time
  • Show
Clear All
new posts
  • RSS Robot

    #1

    New Case Study From Gas Liquids Engineering Highlights Meeker II inColorado, Complete

    (PR-inside.com) http://www.coade.com - COADE announced today the publication of a new Case Study from Gas Liquids Engineering Ltd. on the design of the second phase of the Meeker production complex in the Colorado Piceance Basin, completed in 40% less time using CADWorx Plant Professional. When in full operation, the Meeker facility will provide valuable midstream energy production in the basin. In the case, Bruce Parsons, V.P. of Drafting Services and Information at Gas Liquids Engineering, describes how they used CADWorx tools to deal with the complexity of an elaborate pipe rack, a vital main artery of Meeker ..

    More...
Working...