Good day..
I only found out that ineo 363 are different from 362 and 350. The drum unit, developer,developing unit, transfer roller unit and fussing unit has a predicted yeild date.
Now my question is, is it possible to set continuously those area? specialy drum unit. because when it reach the yield/or life the machine LOCKS up. even though the copies are not that bad.
Can we set it to continues? In the techrep mode?
I only found out that ineo 363 are different from 362 and 350. The drum unit, developer,developing unit, transfer roller unit and fussing unit has a predicted yeild date.
Now my question is, is it possible to set continuously those area? specialy drum unit. because when it reach the yield/or life the machine LOCKS up. even though the copies are not that bad.
Can we set it to continues? In the techrep mode?
Comment