MP 401 tsb#5 transfer roller assy

Collapse
X
 
  • Time
  • Show
Clear All
new posts
  • LNorris
    Senior Tech

    500+ Posts
    • Sep 2008
    • 645

    #1

    MP 401 tsb#5 transfer roller assy

    has anyone done this modification to the machine? there are no steps on the tech bulleting or the service manual. looking for guidance on this, dont want to rip apart more than i need to.

    thanks
  • slimslob
    Retired

    Site Contributor
    25,000+ Posts
    • May 2013
    • 36796

    #2
    Re: MP 401 tsb#5 transfer roller assy

    Haven't done one yet. From looking at the bulletin, I would say that you order the new parts, except 6 and 7 as 15 is 6 and 7 assembled. You then transfer items 1, 3, 8, 9, 10, 11, 12, 13 and 14 along with screws etc to the new item 2. Items 16, 17 and 18 (x2) are new and need to be installed.

    Comment

    • LNorris
      Senior Tech

      500+ Posts
      • Sep 2008
      • 645

      #3
      Re: MP 401 tsb#5 transfer roller assy

      i have the parts on order, just wondering time needed and if there were instructions to rip apart machine

      Comment

      • slimslob
        Retired

        Site Contributor
        25,000+ Posts
        • May 2013
        • 36796

        #4
        Re: MP 401 tsb#5 transfer roller assy

        Originally posted by LNorris
        i have the parts on order, just wondering time needed and if there were instructions to rip apart machine
        The parts explosion in the bulletin should be sufficient to follow. In the past i have figured out how disassemble many things just using the older style parts manuals.

        Comment

        Working...