Ok, this is just plain weird.
I have a law firm with one MP9002 and three MP C8002s, all are set up with GlobalScan Server 2.2.1.
They can't use Serverless, as they need to OCR, which requires the server version.
All firmware and Java are up to date.
When the user goes to select a project icon, the display hangs on "Switching Screens" for 25 to 40 seconds. After that, all scanning is normal. Once the user logs off (no authentication being used) the process will repeat itself, being slow for the next user.
Not a server or network issue; I loaded GSNX on a Server 2008 VM session on my notebook, connected with a crossover, and had the same problem.
Not an issue with these two models, as I went to another customer with the very same two, and it worked normally, nice and fast.
We have done Wireshark packet captures, RLog captures, and the full SMC report, and sent them off to the help desk.
Anyone seen this before? All four machines are doing it.
Thanks.
I have a law firm with one MP9002 and three MP C8002s, all are set up with GlobalScan Server 2.2.1.
They can't use Serverless, as they need to OCR, which requires the server version.
All firmware and Java are up to date.
When the user goes to select a project icon, the display hangs on "Switching Screens" for 25 to 40 seconds. After that, all scanning is normal. Once the user logs off (no authentication being used) the process will repeat itself, being slow for the next user.
Not a server or network issue; I loaded GSNX on a Server 2008 VM session on my notebook, connected with a crossover, and had the same problem.
Not an issue with these two models, as I went to another customer with the very same two, and it worked normally, nice and fast.
We have done Wireshark packet captures, RLog captures, and the full SMC report, and sent them off to the help desk.
Anyone seen this before? All four machines are doing it.
Thanks.
Comment