Hello masters.
I have a km c1060l machine. I replaced 4 drums in this machine. What calibration operations do I need to perform from the service menu after this change? Thanks.
I have a km c1060l machine. I replaced 4 drums in this machine. What calibration operations do I need to perform from the service menu after this change? Thanks.
Comment